Published on May 9th, 2023, this study, commissioned by the CPUC, aims to determine the electric grid requirements at the distribution circuit level, assuming the state achieves its transportation electrification goals by 2035. The study covers the Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E) service territories.


